We carried out a number of Building and Civil Engineering activities involving structural modifications and alterations.
A variety of walls were constructed internally and externally to ‘segment’ on to a number of units within the existing environs of the factory.
Roller-shutter industrial doors were fitted to gain new access points to the existing factory. A new ‘frontage’ was built into the side of the shed complete with all plastering works, windows and pedestrian doors.
Civil Engineering works were undertaken involving the concreting of the adjacent yard and drainage works.


